Redland Bayside NewsRedland Bayside News
  • News & Editorial
  • Digital Editions
  • Pickup Locations
  • Advertise With Us
Reading: Landslip repairs are under way
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Redland Bayside NewsRedland Bayside News
Search
  • News & Editorial
  • Digital Editions
  • Pickup Locations
  • Advertise With Us
Follow US
Redland Bayside News > Community > Landslip repairs are under way
CommunityFeatured News

Landslip repairs are under way

Redland Bayside News
Redland Bayside News
Published: September 6, 2023
Share
2 Min Read
DAMAGE: Repair works have begun at the site of a land slip which took place in 2022 at Wellington Point and forced the closure of a walking track. Photo: Redland City Council
DAMAGE: Repair works have begun at the site of a land slip which took place in 2022 at Wellington Point and forced the closure of a walking track. Photo: Redland City Council
SHARE

Rehabilitation work has commenced for the repair of the embankment slippage on the eastern side of the Wellington Point Reserve escarpment.

Mayor Karen Williams said the works would involve installing an anchor and mesh system to stabilise the embankment.

“Slope stabilisation is technically challenging work that requires specialist consultants and contractors,” she said.

“The anchor and mesh system that is being used will not only help to reduce erosion, but will also promote vegetation growth within the slope.

- Advertisement -

“Council appreciates the community’s patience while work was undertaken to identify recommendations and cost-effective solutions to repair the slippage.”

The embankment slipped during severe weather in February 2022 and caused the closure of the foreshore track between Main Road and the eastern side of Wellington Point Recreation Reserve.

Cr Wendy Boglary said she welcomed the start of repair works, which were expected to be completed by December 1, weather permitting.

“I am relieved that work is now starting to repair the large land slip that occurred on the eastern side of the Wellington Point Reserve escarpment about 18 months ago,” she said. “I know the community will welcome this news and I thank everyone for their patience.”

Traffic control measures will be in place along Esplanade, with fencing and signage to remain on site until the works are complete.

TAGGED:Wellington Point
Share This Article
Facebook Email Print

Latest Community News

$1B price tag to sewer bay islands could send rates soaring, new analysis shows
Community Featured News Redland City Council
Council can’t stop SMBI housing boom, says Rendalls
Community Featured News Redland City Council
‘Over the moon’: Bay Island Lifestyle co-owner reacts to national tourism gold
Community Featured News
Redlands Coast strikes tourism gold
Community Featured News

You Might Also Like

Featured News

Welcome back: Shorebirds event focuses on bugs

October 3, 2024
CommunityFeatured NewsRedland City CouncilSeniors

Tech IT Easy bridges generations with free digital support for Redlands seniors

January 6, 2026
A truck carrying a backhoe slammed into the Pine St Bridge last Wednesday.
CommunityFeatured News

Politicians unite after back-to-back crashes at Wynnum’s infamous bridge

October 27, 2025
Caption: Brisbane City Council has reaffirmed that its work to explore a Metro extension to Capalaba remains on track.
Community

Brisbane Metro expansion progressing as future Capalaba link is examined

December 10, 2025
Copyright © 2026 Local News Group - Website by LNG Digital
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?